Thứ sáu, 10/04/2026
Bắc Ninh 32 °C / 24 - 35 °C
Hotline: +84.889.859.666
bacgiang-en-business Business
Chia sẻ:
icon
0.5 1.0 1.5

Bac Ninh provincial leader inspects traffic congestion measures, Cam Ly railway bridge project

Thứ 5: 15:39 ngày 04/09/2025

BAC NINH – Deputy Party Secretary and Chairman of Bac Giang’s People’s Committee (PPC) Vuong Quoc Tuan on September 3 inspected traffic congestion control in the Van Trung and Quang Chau industrial parks and reviewed progress on the Cam Ly railway bridge project on the Kep–Ha Long line.  

Chia sẻ:
bac-ninh-provincial-leader-inspects-traffic-congestion-measures-cam-ly-railway-bridge-project-postid425678.bbg

Ý kiến bạn đọc (0)

Bình luận của bạn...