Thứ tư, 01/04/2026
Bắc Ninh 26 °C / 23 - 27 °C
Hotline: +84.889.859.666
bacgiang-en-business Business
Chia sẻ:
icon
0.5 1.0 1.5

Bac Giang accelerates site clearance for Cam Ly bridge and railway overpass project

Thứ 5: 21:14 ngày 03/04/2025

BAC GIANG - On the afternoon of April 2, Vice Chairman of the Bac Giang Provincial People's Committee (PPC) Phan The Tuan inspected the progress and results of land clearance compensation and resettlement at the construction site of the new Cam Ly bridge and the railway overpass on the Kep - Ha Long railway line.

Chia sẻ:
bac-giang-accelerates-site-clearance-for-cam-ly-bridge-and-railway-overpass-project-postid415438.bbg

Ý kiến bạn đọc (0)

Bình luận của bạn...